I wrote on piping dia inch in my earlier post (http://plannerworld.blogspot.com/2014/07/planning-for-piping-tie-in.html), but here I would like to share on the excel tracking sheet for completed dia inch in the event of shutdown.
Tracking with Primavera on the Tie-in schedule is good practise. But a good planner always aware that Primavera is just another tool for planning and scheduling. At times we want our subcontractors to have the tracking being done in excel sheets. In fact this will be much more easier for those who is in supervisor level to know how many more dia-inch to go.
In construction projects Dia Inch Is a unit of Measure is used to measure the progress of Piping Spool fabrication.The weld joint of the pipe size is converted to the equivalent dia inch of welding or piping tie-in.
What you will find in the attachment.
Download Link : http://mbx.cm/t/CSILn
0 comments:
Post a Comment